Commissioning, FAT and SAT for Automation Systems

Factory and site acceptance testing, commissioning, startup support and operator training for PLC, HMI and SCADA systems.

Factory Acceptance Testing

FAT happens off site before anything touches your live system — so new PLC, HMI and SCADA code is proven before the shutdown window.

Site Acceptance Testing And Commissioning

SAT and commissioning at the plant, staged around shutdown windows and production constraints.

Training And Documentation

Startup support, operator training and handover: production stable, backups delivered, team trained, documentation complete — drawings, backups, change log and test evidence. Use our Commissioning kickoff and close pack to structure kickoff and close-out checklists.

Where It Fits

Commissioning is included in Controls Upgrade, SCADA and HMI integration and Full Project Delivery, and available through embedded engineers on integrator-led projects. Process: how it works. Recent project work includes CIP and production commissioning. See also automation training for plant teams.

Common
Questions

Does Liquid Consulting do FAT and SAT for PLC systems?

Yes. Liquid runs Factory Acceptance Testing off site before anything touches the live system, then Site Acceptance Testing and commissioning at the plant.

What is included in Liquid's commissioning?

Liquid's commissioning covers site acceptance testing, startup support, operator training and a documented handover with drawings, backups, a change log and test evidence.

Why does off-site FAT matter for upgrades?

Off-site FAT lets the new PLC, HMI and SCADA code be tested before the plant's shutdown window, so the live cutover is shorter and lower risk.

Does Liquid train operators after startup?

Yes. Operator training is part of Liquid's commissioning and handover, and production is handed back only when it is stable and the team is trained.

Can Liquid provide commissioning engineers for another integrator's project?

Yes. Through its embedded engineering resources, Liquid can place commissioning engineers on another automation company's project in minimum two-week blocks.

Talk To An
Automation Engineer

Tell us what is being commissioned and your timeline.